Modbury WWTW
The Problem
Tucked in South Devon, the Modbury Wastewater Treatment Plant was facing a familiar but pressing challenge. Tightened discharge regulations meant the site was operating on the edge of compliance for Total Suspended Solids (TSS).
At the time, the plant needed to meet a limit of <15 mg/l, but with stricter regulations looming - dropping to <10 mg/l by 2022 - it was clear the existing setup wouldn’t cut it for long. The aging microscreen filtration system had reached the end of its operational life, and incoming solids levels of 35–40 mg/l added further pressure.
In short: rising standards, aging infrastructure, and very little margin for error.